logo
Guangzhou Qireal Machinery Equipment Co., Ltd. 86--13826061887 Sarahlee68@163.com
SK330-8 Excavator Oil Level Dipstick Guide Tube for J08E Engine

SK330-8 Excavator Oil Level Dipstick Guide Tube for J08E Engine

  • Highlight

    SK330-8 excavator dipstick guide tube

    ,

    J08E engine oil level dipstick

    ,

    excavator engine oil dipstick tube

  • Product Name
    Oil Level Gauge Guide Tube
  • Engine Model
    J08E
  • Quality Level
    High Quality
  • Engine Type
    Diesel
  • Quality
    High Quality
  • Condition
    New
  • Type
    Pipe
  • Delivery Time
    1-5 Work Days
  • Place of Origin
    China
  • Model Number
    J08E
  • Minimum Order Quantity
    1 set
  • Price
    Negotiable
  • Packaging Details
    neutral package or according to the customer request
  • Delivery Time
    2-8 work days
  • Payment Terms
    T/T,Western Union,,D/A
  • Supply Ability
    1000pcs/month

SK330-8 Excavator Oil Level Dipstick Guide Tube for J08E Engine

SK330-8 Excavator Oil Level Dipstick Guide Tube for J08E Engine

 

Quick Details:   Description:  
Model SK330-8 Engine Model: J08E
Produce name Oil Level Dipstick Guide Tube Pack Quantities: 1piece

 

 

SK330-8 Excavator Oil Level Dipstick Guide Tube for J08E Engine

Other model

SK330-8 Excavator Oil Level Dipstick Guide Tube for J08E EngineSK330-8 Excavator Oil Level Dipstick Guide Tube for J08E Engine
Related Products


We can supply you all kinds of excavator spare parts as following:

 

 

Electric Parts:
Controller, Monitor, Panel, Throttle motor, Solenoid valve, Pressure sensor, Switch, Wiring harness, Air conditioning, Air con panel, Air conditioning condenser, Starter motor, Alternator, Working lamp, Hour meter, Battery, Pressure meter, etc.


Engine Parts:
Cylinder block, Cylinder head, Crankshaft, Camshaft, Engine assy, Injector, Fuel injection pump, Oil pump, Feed pump, Radiator, Oil cool
.

 

Packaging & Shipping

 

1. High Quality Standard Carton and Export Plts;

 

2. According to your request.

Delivery Details :

Generally it is 3-10 days if the goods are in stock. or it is 15-45 days if the goods are not in stock, it is according to quantity.

 

3.By sea, by air or by express (DHL, FEDEX ,TNT,UPS,EMS).

 

FAQ

 

Q1:Can i Get samples?

A1:Of course, we usually provide existing sample for free, however you need to cover the express charge, and if you have special request then we will charge you for special arrangement, and this charge is refundable when order is up to a certain quantity.

 

 

Q2: What's the delivery time of your products?

A2: Usually the delivery time is 3-7 days after confirming order and detail. Delivery time depending on your purchasing quantity and production season.

 

 

Q3: How does your factory do regarding quality control.

A3: Quality is priority, we will do 100% quality inspection before shipment.

 

 

Q4: what is your terms of payment?

A4 Normally T/T, but we also accept L/C, PAYPAL.For mass production: 30% deposit before mass production,70% before shipment.