logo
Guangzhou Qireal Machinery Equipment Co., Ltd. 86--13826061887 Sarahlee68@163.com
Electrical Parts E320B Excavator 6 Lines Ignition Keys Switch 7Y-3918 7Y3918

Electrical Parts E320B Excavator 6 Lines Ignition Keys Switch 7Y-3918 7Y3918

  • Highlight

    E320B Excavator Ignition Switch

    ,

    6 Lines Ignition Keys Switch

    ,

    7Y-3918 Excavator Electrical Parts

  • Appliion
    Crawler Excavator
  • Product Name
    Ignition Switch
  • Model
    E320B
  • Part No
    7Y3918
  • Color
    Gray
  • Package
    Carton
  • Lines
    6 Lines
  • Payment Items
    Bank Transfer/Western Union
  • Place of Origin
    China
  • Model Number
    E320B
  • Minimum Order Quantity
    1 Piece
  • Price
    Negotiable
  • Packaging Details
    carton
  • Delivery Time
    2-5 days
  • Payment Terms
    L/C,T/T,Western Union
  • Supply Ability
    1000 pieces/month

Electrical Parts E320B Excavator 6 Lines Ignition Keys Switch 7Y-3918 7Y3918

Electrical Parts E320B Excavator 6 Lines Ignition Keys Switch 7Y-3918 7Y3918

 

Product Description
 
Product Name
Ignition switch
Part Number
7Y-3918
Appliion for
E320B
Place of Origin
China
H.S Code
8409999990
Single Packing
Carton
Lead Time
2 days after payment

 

Electrical Parts E320B Excavator 6 Lines Ignition Keys Switch 7Y-3918 7Y3918Electrical Parts E320B Excavator 6 Lines Ignition Keys Switch 7Y-3918 7Y3918

Company Profile

GuangZhou Qireal Machinery Equipment Co., Ltd is a specialized and diversified enterprise with integrating development production, sales & agency services.


Specialized in: Solenoid Valves, camshaft.Adjuster fitting and etc.
Wholesaling: Electrical Parts and Engine Parts.

 

 

 

HOT SELLING RELATED PARTS : 

 

Electric Parts:
Controller, Monitor, Panel, Throttle motor, Solenoid valve, Pressure sensor, Switch, Wiring harness, Air conditioning, Air con panel, Air conditioning condenser, Starter motor, Alternator, Working lamp, Hour meter, Battery, Pressure meter, etc.


Engine Parts:
Cylinder block, Cylinder head, Crankshaft, Camshaft, Engine assy, Injector, Fuel injection pump, Oil pump, Feed pump, Radiator, Oil cool.

 

 

Packaging & Shipping

1. High Quality Plastic bottle, Standard Carton and Export Plts;

2.According to your request.

Delivery Details :

Generally it is 3-10 days if the goods are in stock. or it is 7-15 days if the goods are not in stock, it is according to quantity.

 

 

FAQ

FAQ
Q: Which payment terms will you accept?


A: We can accept TT, Western union, paypal and cash etc , besides .

 

Q: When my order will be shipped?

A:Once we get payment, we will ship your order within 2 working days.

 

Q: Which shipping will you offer?

A:By sea, air, DHL, Fedex, TNT, UPS, EMS, SF

 

Q: How long does it take to my address?

A:The normal delivery time is 4-7 days, depending on which country you are in.

 

Q: How can I trace my order?

A:We will send you the tracking number by email.

 

Q: If I am not satisfied with the products, what should I do?

A:You can contact us and tell us about your problem. We will offer exchange or repair service under warranty.