logo
Guangzhou Qireal Machinery Equipment Co., Ltd. 86--13826061887 Sarahlee68@163.com
07058-20000 is used for Komatsu bulldozer D155AX-5

07058-20000 is used for Komatsu bulldozer D155AX-5

  • Highlight

    07058-20000 Filter Assy

    ,

    Filter Assy CS210

    ,

    D155AX Filter Assy

  • Product Name
    FILTER ASS'Y
  • Model
    CS210 CS360 CS360SD D135A D155A D155AX D155S D155W D85A D85E D85EX D85
  • Part No
    07058-20000
  • Quality
    High Quality
  • Color
    Gray
  • Condition
    New
  • Place of Origin
    MADE IN CHINA
  • Model Number
    CS210 CS360 CS360SD D135A D155A D155AX D155S D155W D85A D85E D85EX D85
  • Minimum Order Quantity
    1 PCS
  • Price
    Negotiable
  • Packaging Details
    Packaging Details: carton;
  • Delivery Time
    5-8 work days
  • Payment Terms
    L/C, D/A, D/P, T/T, MoneyGram
  • Supply Ability
    10000 Piece/Pieces per Month

07058-20000 is used for Komatsu bulldozer D155AX-5

07058-20000 is used for Komatsu bulldozer D155AX-5

 

Product name
Filter
Model name
CS210 CS360 CS360SD D135A D155A D155AX D155S D155W D85A D85E D85EX D85
   OEM NO    07058-20000
Packing
ton box
Delivery time
5-7 days
Condition
100% new
MOQ
1 piece
Warranty
6 months
Shipment
DHL FEDEX TNT EMS UPS
Payment
TT,Money Gram, Westem Union

 

PC60-8 600-211-2111 Oil filter
PC70-8 600-311-3870 Diesel filter
  600-311-4120 Additional diesel filter
  600-185-2200 Air filter
  21W-60-41121 Hydraulic oil filter
PC200-7 6736-51-5142 Oil filter
PC210-7 6732-71-6111 Diesel filter
PC220-7 600-311-9121 Additional diesel filter
  207-60-71182 Hydraulic oil filter
  600-411-1191 Water Filter
  20Y-60-21470 Respiratory filter
  600-185-3100 Air filter
  600-185-4100 Air filter
 

 

07058-20000 is used for Komatsu bulldozer D155AX-5 0

 

Other model:

07058-20000 is used for Komatsu bulldozer D155AX-5 107058-20000 is used for Komatsu bulldozer D155AX-5 2

07058-20000 is used for Komatsu bulldozer D155AX-5 3

 


Packaging & Delivery

 

Packaging Details: 1. According to orders,pack the spare parts one by one by oil paper;

2. Put them into small carton boxes one by one;
3. Put the packed small carton boxes into bigger carton boxes one by one.
4. Put the bigger carton boxes into wooden boxes if necessary especially for the shipments by sea.
5. Goods is packed by oil paper and plastic bags inside.
6. Using wooden case package.
7. We support the custom-made demand for package.

   Port: Huangpu Port.

   Lead Time: Shipment will be effective within 2 days after receive payment.